The current head office in Kusado-cho, Fukuyama, was originally opened as Fukuyama Factory in August 2008, and the head office functions have been centralized in Fukuyama factory since October 2008.
An extended building was completed in May 2015 to improve productivity and quality in manufacturing.
The address of the registered head office was changed on December 1, 2018.
Entrance
At the entrance, we welcome our customers cheerfully.
Showroom
Looking at the current models operating in the showroom, customers can realize the real instrument under
consideration more easily. Tokyo branch also has a similar showroom.
Design Room
We make our robots and products in the design room. Divided in mechanical, electrical, and soft design
sections, each specialist staff desings by working together with each customer and discussing our proposed
solution in response to customers’ request. For new product development, we have developed products to
satisfy customers by considering the best forms and accuracy to meet the needs based on sales information.
Training Room
To realize the product maintenance by customers, we provide maintenance trainings for various robots. Our
training menu varies from a 3-day standard to custom programs to meet customers’ requests.
Clean Room 1, 2
Clean Room 1 Area: About 526m2
Clean Room 2 Area: About 246m2
Cleanliness: Class 10,000 After assembling the wafer transfer robot for
semiconductors and FPD glass substrate transfer robot and conducting a performance inspection and
pre-shipment inspection, we make shipment to each user. The HEPA filter (99.97%) ventilates the clean room 25
times an hour. Together with Clean Room 1 and 2, we are capable of manufacturing over 300 robots a month
(when robot is converted to our standard robot, SCR series). Clean Room 2 is where parts are assembled by
unit to make up robots.
Shipping Room / Packing Room
Shipping Room / Packing Room is an area we prepare for final packing for the products finished
the assembly and inspections. In our last process flow, we put products into the dedicated packages fitting
to each shipping product. A roof at the entrance is provided for delivery where large trucks can pull up
alongside the building. From small products as represented by robot for semiconductors to large systems, we
can deliver regardless of weather conditions.
Clean Room 3
Area: About 237m2 Ceiling height: 4m Cleanliness: Class 10,000
Clean Room 3,
new clean room located in the new building completed in May 2015 is equipped with a jib crane. The HEPA
filter (99.97%) ventilates the clean room 10 times an hour.
Clean Booth
Area: About 11.6m2(Outside Dimension: W2895 x L4020 x H3525) Cleanliness: Class 1
Air circulation type clean booth installed in a clean room in March 2016 is capable of measuring with larger
and a cleaner atmosphere as compared with the existing clean room. (The area and volume are increased by 1.8
times and 2.6 times.)
Conventional ULPA filter (99.999% (particle diameter of 0.1 to 0.2 µm)) is improved to ULPA+PTFE filter
(99.9999% (particle diameter of 0.1 µm)). To meet a requirement of higher cleanliness, particle
measurement is performed in a class 1 clean booth aiming to manufacture reliable products.
Clean Room 4
Area: About 129m2 Ceiling height: 8.5m (Height of the crane from ground: 7m) Cleanliness:
Class 100,000
Clean Room 4, new clean room located in the new building completed in May 2015 is
equipped with two overhead traveling cranes. The HEPA filter (99.97%) ventilates the clean room 7 times an
hour. Large-sized products are manufactured with a high ceiling, estimating the total production of 10
large-sized systems a month.
Development Section
In the Development Section, the examination of new product specifications or development of new products
are conducted to meet the customer's needs. This room is the start of many JEL new products to come.